Trampoline Park Incentives: What a City Really Gives Up
Belton, Missouri voted 7-2 on 13 October 2026 to abate about $56 million in property tax over 20 years on a 40-acre entertainment district. Nine days later, O’Fallon, Missouri approved a $15 million bond issue for a 47,610 sq ft (4,423 m²) sports and entertainment building, with a 10-year abatement at 50% of the tax burden. Fate, Texas approved up to $6.5 million for a 274,000 sq ft (25,455 m²) mixed-use center on a 6-0 vote.
The three headlines read as if they were the same kind of number. They are not. One is a grant of city money. One is a bond the developer repays. One is tax that is never billed.
Add them together, or rank them by size, and the result means nothing. Price them per square foot with the terms intact, and a different picture appears: two Missouri cities, working under the same statute, gave up 25% and 84% of an equivalent 20-year tax bill.
What decides whether a package is worth taking is four clauses, not a headline. The base the abatement is measured against. The taxing districts that absorb the loss. Whether the city takes title to the building. And the clawback, which is the only part of the deal with a clock attached.
Everything below comes from council reporting, one city press release and coverage of the votes. Where a figure was not published, this article says so rather than estimating it. If you are budgeting a build, the same arithmetic applies to your site whether or not your city runs a program.
1. Three agreements, three instruments
Missouri and Texas give cities two different tools, and the difference matters more than the amounts. A Chapter 100 industrial revenue bond issue lets a city take title to the property, issue bonds, and lease the building back. A Chapter 380 agreement in Texas is a grant or loan of city funds and services. One is a financing structure with a title transfer inside it. The other is a check, or a promise of one.
O’Fallon’s economic development director described the Missouri mechanism to Mid Rivers Newsmagazine: the city becomes owner of record, the property sits in the public domain and becomes tax-exempt, and the company makes a payment in lieu of taxes (PILOT) to the taxing districts. The council resolution also gives the applicant a sales tax certificate so construction materials are exempt. The city carries no debt, and the applicant repays the bonds.
Fate’s package is built from reimbursements rather than a check. The city committed to cover internal site bridge costs up to $2.5 million, to reimburse bridge construction at 50% of the combined city and municipal development district sales tax the development generates, to credit up to $800,000 in roadway impact fees for a traffic signal, and to waive about $3.2 million in one-time development fees. The total is capped at $6.5 million.
| Term as published | O’Fallon, MO | Fate, TX | Belton, MO |
|---|---|---|---|
| Instrument | Chapter 100 industrial revenue bonds | Chapter 380 economic development agreement | Chapter 100 industrial revenue bonds |
| Vote and date | 7-0, council meeting 22 Oct 2026 | 6-0; city release 19 Oct 2026 | 7-2, final reading 13 Oct 2026 |
| Package headline | About $15M bond principal | Up to $6.5M | $250M bond principal |
| Property tax treatment | 10 years at 50% of the tax burden | Not disclosed; sales tax share instead | About $56M abated over 20 years |
| Other items | Construction materials sales tax exemption | $2.5M bridge cap, $800k impact fee credits, about $3.2M fee waivers | Up to $7M sales tax reimbursement; materials exemption; PILOT at 25% |
| Clawback | Not stated in the report | About $1M per anchor, 5-year clock | Not stated in the reports |
| Space | 47,610 sq ft (4,423 m²) on about 6 acres | 274,000 sq ft (25,455 m²); site not disclosed | 110,000 sq ft (10,219 m²) entertainment, plus 37,500 sq ft retail and restaurant |
| What is built | Six-tenant retail building, covered athletic field, 20,700 sq ft of hard courts, family entertainment | Indoor entertainment complex, cinema, four-star hotel, grocer, retail | Cinema complex with go-kart track and bowling, restaurants, 600 apartments |
Read the third row against the fourth. O’Fallon’s $15 million is bond principal, which the developer repays with interest. It is not a subsidy: no part of it is a gift. Belton’s $250 million is the same instrument at 17 times the size, and what the public gives up there is not the bond either: it is the tax the finished buildings would otherwise have paid.
The only headline figure in the table that is a transfer of public money is Fate’s $6.5 million ceiling, and even that is a cap across three instruments rather than a sum paid on day one.
2. Priced per square foot, the spread is 3.3 times
To compare, put each package over the floor area the city disclosed and keep the units honest. O’Fallon: $15,000,000 divided by 47,610 sq ft gives $315.06 per sq ft of bond principal. Fate: $6,500,000 divided by 274,000 sq ft gives $23.72 per sq ft. Belton: $56,000,000 divided by 147,500 sq ft of non-residential space gives $379.66 per sq ft, which spread over the 20-year term is $18.98 per sq ft a year.
The Belton denominator is an upper bound rather than a clean measure. The abatement covers the whole 40-acre project, including 600 apartments, while the square footage disclosed is only the non-residential part. Dividing by the smaller denominator makes the per-square-foot figure look larger than it is. It is still the right order of magnitude, and it is the only published basis for a comparison.
| Converted metric | O’Fallon, MO | Fate, TX | Belton, MO |
|---|---|---|---|
| Package per sq ft of disclosed space | $315.06 (bond principal) | $23.72 | $379.66 over 20 years, or $18.98 a year |
| Gross property tax per sq ft over 20 years | Not published | Not applicable | $454.24 |
| Tax paid per sq ft over 20 years | Half the bill for 10 years | Not applicable | $77.97, or $3.90 a year |
| Share of gross tax abated | 50% for 10 years, which is 25% of a 20-year bill | Not applicable | 83.6% |
| Clawback as a share of the package | Not stated | 15.4% | Not stated |
| Months of work before the vote | About 48, from staff work begun in 2022 | Not disclosed | About 18 |
Two Missouri cities, one statute, and a 3.3-times gap in what the public gives up. O’Fallon keeps half the tax for a decade and then collects the full bill. Belton collects about 17% across two decades. On a building assessed at the same value, the second deal costs the taxing districts roughly three times what the first one does.
That gap is the reason to read agreements rather than announcements. The statute authorizes a power and sets no rate. Every number inside it is a local decision, and two neighboring cities can reach opposite conclusions about identical projects without either of them being wrong.
3. The abatement is measured against buildings that do not exist
Belton’s $56 million is calculated against the tax the finished district would generate, not against what the land pays now. KSHB reported that the farmland makes minimal property tax revenue today. So the gross figure, upwards of $67 million over 20 years, describes buildings that have not been built, and the $56 million describes the difference between two hypothetical bills.
That does not make the abatement worthless. It makes it conditional. The city’s side of the trade is the $11.5 million the developer does pay, which works out to $575,000 a year, plus the sales tax the district generates once it opens.
The other number worth holding next to it is the $53.2 million financing gap the developer disclosed. A $56 million abatement looks as though it closes a $53.2 million gap. It does not, because the figures are in different units. The gap is money needed before opening. The abatement is a stream over 20 years.
| Present value of the Belton abatement | Annual forgone tax | Value today | Share of the $53.2M gap |
|---|---|---|---|
| Even spread, discounted at 5% | $2.80M | $34.89M | 65.6% |
| Even spread, discounted at 7% | $2.80M | $29.66M | 55.8% |
| Even spread, discounted at 9% | $2.80M | $25.56M | 48.0% |
| Nominal sum, no discounting | $2.80M | $56.00M | 105.3% |
The arithmetic is short: $56 million divided by 20 years is $2.8 million a year, and that annual figure multiplied by the 20-year annuity factor at each rate gives the value today. The derived figures assume an even spread, which no abatement actually follows. Use them to see the shape of the trade, not as a valuation.
What the shape says is that the abatement is not sized to fill the gap in present-value terms. It is sized to make an annual debt service number work, which is how a developer with a lender in the room would frame it. If you are negotiating your own package, that is the calculation to run: annual forgone tax against annual debt service, not the headline total against the project cost.
The clause to ask about: whether the abatement applies to the full bill or only to the increment over the current assessment, and what assessed value the city assumed. Belton’s coverage states neither, and the difference between those two structures is most of the value.
4. Who pays: the school district line
In Belton, about $35 million of the $56 million falls on the school district. That is 62.5% of the abatement landing on one taxing jurisdiction, and it explains the sequence of the vote. At its September meeting the council asked city staff to meet the district. After that meeting, the developer’s payment in lieu of taxes rose to 25%, which KSHB reported adds about $800,000 in city revenue.
That $800,000 is a 7.0% addition to the $11.5 million the developer pays over the term, agreed between first reading on 22 September and final approval on 13 October. No part of the project changed in those three weeks, only who was carrying the cost.
For anyone negotiating a similar deal, the lesson is about sequencing rather than generosity. A term sheet agreed before the school district has weighed in is not a term sheet. Where the abatement lands mostly on a jurisdiction that is not in the room, expect the terms to move between readings, and put the second reading in your schedule.
The two published shares also fail to reconcile, which is a reason to read the agreement itself. Belton pays about 17% of the gross bill according to the coverage, while the PILOT is described as 25%. The gap is probably the difference between the city’s share alone and the combined taxing districts, but no source says so, and this article will not invent the reconciliation.
5. Cash or a bond: what a title transfer changes
A Chapter 100 deal puts the city’s name on the deed for the term of the bonds. That is what creates the exemption, and it is also the part of the structure that owners underestimate. Your building is, on paper, public property for 10 or 20 years.
Some consequences are mechanical and some are contractual, and the reporting does not separate them. The mechanical part is the tax treatment: the property is exempt and the payment in lieu of taxes is the substitute. The contractual part covers everything else, and it is where a build can snag:
- Equipment financing. Lenders take security over equipment. When the building is owned by the city, the consent and lien mechanics need to be settled before the equipment purchase order rather than after.
- Sale and refinancing. An operator who wants to sell or refinance during the bond term needs to know whether the lease can be assigned, and on what terms.
- Insurance and repair obligations. Public ownership rarely changes who insures the contents, but it changes who signs.
- Early redemption. If the bonds can be retired early, the abatement period may shorten with them.
None of that is a reason to refuse the instrument. It is a reason to read the lease and the bond documents before signing the equipment contract. The equipment line in a trampoline park is the part a lender discounts most, and it is also the part an incentive package almost never touches.
6. The clawback is the only clause with a clock
Fate’s agreement requires each anchor to obtain a certificate of occupancy and begin business within five years of execution, or roughly $1 million comes back. On a package capped at $6.5 million, that is 15.4% of the total exposed to a date.
Five years sounds generous for a building. It is not generous for a project that needs a cinema anchor, a hotel and a grocer to commit before the first phase pencils, and the Belton case shows why. That district was approved with four phases and an unfunded $53.2 million gap, and the coverage states that the developer intends to return to the council for a further round of incentives for part of the project.
The clock is also the part of the deal that costs money before it returns any. Belton took about 18 months from the first memorandum of understanding in spring 2025 to the October 2026 vote. O’Fallon’s staff had been working on its project since at least 2022, which is roughly four years to a bond resolution.
Cost of negotiation months = months from first meeting to approval
x monthly carry (rent, debt service, payroll, design fees)
Compare with the present value of the abatement over the same term.
The carry figure is site-specific, and this article will not invent one. The structure of the comparison is what matters: an incentive that takes four years to close is competing against the rent you pay while you wait. A worked example of carry per day sits in our analysis of a lease tail after closure, and the same arithmetic applies to a delayed start.
One more asymmetry is worth naming. Fate’s clawback is per anchor, so a project that delivers the cinema and the grocer but not the entertainment complex may still owe money. Ask which anchor the clawback attaches to before treating it as a completion test.
7. What the money does not buy
None of these three packages pays for equipment. The closest any of them comes is the sales tax exemption on construction materials, which is a real saving on steel, concrete and mechanical work, and an open question on imported play equipment fixed to the floor.
That question is worth putting in writing. A materials exemption is written for construction materials incorporated into real property. Whether a trampoline structure, a soft play frame or a climbing wall counts as a material, as equipment, or as neither depends on how the jurisdiction reads it, and freight and installation labor usually sit outside either definition. Ask for a written determination before you place the order, not after the invoice.
The timing of the rest matters too. Fate’s bridge reimbursement is a share of sales tax the development generates, so it arrives after opening. Belton’s $7 million sales tax reimbursement starts after completion by design. These are not construction funds.
What the packages do buy is ground work: bridges, signals, impact fees, site access, fee waivers. That lowers the shell cost and shortens the path to a certificate of occupancy. It does not change what a square foot of play equipment costs, and it does not change the number a lender will advance against it.
For the equipment side of the budget, the useful comparisons sit elsewhere: build cost per square foot across five filings, how much debt service the rent allows, and the court and bed specification that sets the largest single line in the fit-out. Compliance documentation for that equipment is a separate file a city incentive will never cover, and the checks are set out in our safety standards overview.
8. What the data does and does not show
This dataset is three agreements in two states, all adopted within one month. That is a sample of three. It is enough to show how the instruments differ and what the clauses do. It is not enough to describe a national market, and no average of $15 million, $6.5 million and $250 million would mean anything.
None of the three is a standalone trampoline park. Belton’s entertainment complex is cinema-led, with a go-kart track and bowling. Fate’s is one anchor in a mixed-use district that also needs a hotel and a grocer. O’Fallon’s is a sports building with family entertainment inside. A 1,500 m² jump park leasing a unit in an existing center would not be eligible for any of these structures, and the decisions in this article do not transfer to it.
Several numbers are not published at all. No assessed values, no mill levy rates, no net operating income, no tenant improvement allowances and no full agreement texts. The figures here come from council reporting, one city press release and television coverage of a vote. The $67 million and $56 million totals are 20-year nominal figures from that coverage, not from the agreements.
The Belton reconciliation gap noted above is a live example of why that distinction matters. So is the jobs case: the 500 jobs and $16 million in wages are the developer’s estimates as reported, not verified outcomes, and no clawback in the coverage is tied to them.
Two structural limits apply to any comparison across borders. Chapter 100 and Chapter 380 are American instruments, and the United Kingdom has no negotiated equivalent: business rates are set by a national multiplier and a revaluation, as our 2026 revaluation analysis sets out, and there is no city to negotiate an abatement with. Within the United States, a negotiated abatement is also a different mechanism from the standing personal property exemption that applies whether or not anyone negotiates.
Finally, the direction of causation is not what it looks like. A city that offers a package is a city competing for a project, and the offer is evidence of what that city will pay, not proof that the project needed the money. Belton’s disclosed gap makes the case for need; Fate’s package does not disclose enough to judge.
9. Decision rules
These are the conditions under which each structure is worth pursuing, drawn from the three deals above. They are rules for a specific site, not a forecast for the sector.
If you are leasing under about 2,000 m² inside an existing building, this market is closed to you. All three packages attach to new construction on land the city can title or tax. Ask instead for fee waivers, a tenant improvement allowance, or a rent abatement during fit-out.
If the abatement exceeds 70% of the gross tax bill, expect the terms to move before final approval. Belton’s school district carried 62.5% of the cost, and the PILOT rose between readings. Budget a second reading and a schedule slip.
If the clawback per anchor exceeds 15% of the package, treat the opening date as a covenant. Fate’s $1 million per anchor on a $6.5 million ceiling is 15.4%. That is a date with a price on it, and it belongs in the construction schedule rather than the legal file.
If the city takes title, get lender consent in writing before the equipment order. The building being public property is the mechanism, not a side effect, and the equipment security package has to work inside it.
If the present value of the abatement is smaller than the carry on the extra months of negotiation, the deal is not worth the delay. Run the two numbers before the second meeting, not after the fourth.
The wider point survives the caveats. In a business where the fit-out is the largest single cost and the rent is the largest recurring one, a city that will pay for the ground work, the fees and part of the tax bill is changing the shape of the capital stack. It is not changing whether the park works. That still depends on the floor plan, the equipment specification and the attendance the site can support, which is what the design and delivery process is built to test before anything is ordered.
If you are weighing a site and want the equipment line priced against the shell you are being offered, send the building dimensions and the proposed unit. A layout for a comparable floor area is the fastest way to see whether the incentive is paying for the part that matters. The reference breakdown for a 22,000 sq ft park shows what that comparison looks like line by line.
FAQ
Do cities give money to trampoline park projects?
Some do, but rarely as a cash grant to the operator. The three 2026 agreements reviewed here went to developers of new buildings and districts, and they came in three forms: a bond issue the developer repays, a capped set of fee waivers and reimbursements, and a property tax abatement. An operator leasing a unit in an existing center is usually outside all three.
What is a Chapter 100 bond and who owns the building?
Under Missouri’s Chapter 100, the city issues industrial revenue bonds, takes title so the property sits in the public domain as tax-exempt, and leases it back. The company repays the bonds and pays a payment in lieu of taxes to the taxing districts. During the bond term the city is the owner of record, which affects equipment financing, insurance and any sale.
Is a property tax abatement better than a cash grant?
They do different things. An abatement is worth more the longer you hold the building and the higher the assessment, and it is worth nothing in the first year, when there is no revenue to tax. A grant or a fee waiver reduces the money you have to raise before opening. Belton abated about $56 million over 20 years; Fate waived and reimbursed up to $6.5 million around opening. Most projects need the second kind more than the first.
What is a clawback in an incentive agreement?
A clawback is the clause that takes the incentive back if the project misses a condition, usually a deadline or an investment threshold. Fate’s agreement requires each anchor to obtain a certificate of occupancy and begin business within five years, with about $1 million per anchor at risk. A clawback converts a subsidy into a performance obligation, so it belongs in the construction schedule, not only in the legal file.
Can a leased trampoline park get these incentives?
Rarely. All three packages in this review attach to new construction on land the city can title or tax, and two of them cover whole districts rather than single tenants. A tenant leasing space in an existing building has no property tax bill of its own to abate. The realistic asks at that scale are a tenant improvement allowance, waived permitting fees, or a rent-free fit-out period.
Sources
- Mid Rivers Newsmagazine, “New sports facility looks at space off Hwy. P”, 22 October 2026 midriversnewsmagazine.com
- City of Fate press release via Blue Ribbon News, “City of Fate Approves Chapter 380 Agreement Advancing Fate Yards Entertainment Development”, 19 October 2026 blueribbonnews.com
- Rockwall Herald Banner, “Fate City Council approves up to $6.5M in incentives for developer of Fate Yards project”, October 2026 rockwallheraldbanner.com
- KSHB 41, “Belton approves finance incentives for Uptown Entertainment District, home to B&B Theatres”, 13 October 2026 kshb.com
- TribeKC Realty, “Belton’s Uptown District Got Its Tax Break. The Order It Gets Built In Matters More.”, October 2026, summarising the KSHB figures and the four-phase build order tribekcrealty.com
- City of Frisco, “Frisco Approves Agreement to Apply for State Incentives to Support Toyota Stadium Mixed-Use Project”, 20 October 2026, an example of the same Texas instrument capped by hotel occupancy tax friscotexas.gov
Per-square-foot figures, present values and the reconciliation gap are derived by this article from the published terms. They are not released by any of the three cities.
