Trampoline Park Supervision: The 1:15 Ratio a Court Named
On 17 September 2024, the County Court of Victoria ordered Bounce Australia Pty Ltd to pay a fine of A$40,000 and A$5,557 in costs over a four-metre fall at its Grovedale centre near Geelong. No conviction was recorded. The injured person was eleven years old.
The boy had already climbed the wall twice that day. On his third attempt he raced a friend to the top, pressed the timer button and pushed himself off. He believed he was attached, because the safety mat was lying on the floor at the base of the wall. The auto-belay cable was still retracted overhead. He fell four metres and was taken to hospital with a fractured sternum and soft tissue injuries to his back.
WorkSafe Victoria’s investigation did not find a faulty belay. It found that the centre had no system to ensure customers in the climbing area were properly supervised, and no system to brief them on the rules before they entered. The court then listed six measures it considered reasonably practicable in the circumstances.
One of those six is a number: one employee for every fifteen customers. That number now circulates in operator discussions as if it were a standard. It is not a standard. It is a remedial benchmark set after an injury, in one jurisdiction, for one type of task.
This article takes the case apart in the order it happened, sorts the six measures by what each one actually controls, converts the ratio into staffed hours using formulas rather than invented traffic figures, and marks clearly where the public reporting stops. If you are costing a climbing element into a trampoline park, the difference between reading this as a staffing target and reading it as a task-design problem is roughly the difference between four staff on a Saturday block and one burned-out attendant.
1. Four metres, and the sequence that produced it
The wall used an auto-belay: a cable running to an automatically retracting friction device at the top. At the bottom, a carabiner was clipped to a mat on the floor. To climb, a customer had to unclip the carabiner from the mat and attach it to their harness, which released the mat. Afterwards they were expected to clip it back to the mat for the next user.
This is a common and perfectly lawful arrangement. It is also an arrangement that puts the safety-critical check in the hands of the customer. The mat on the floor is meant to be a byproduct of a correctly parked belay, but to an excited child it reads as a ready signal. The check is performed by the least reliable actor in the system, at the exact moment the system is most likely to be tested, which is when children are racing each other.
Read the sequence again with that in mind. Two clean climbs teach a habit. A race breaks the habit. The visual cue that should have contradicted the habit, the retracted cable overhead, is four metres above a child’s eye line. Nothing in the building stopped him, because nothing in the building was watching the wall.
| Date | Event | Outcome |
|---|---|---|
| May 2022 | Eleven-year-old falls four metres from a climbing wall at Grovedale, Victoria | Fractured sternum, soft tissue injuries to the back |
| March 2024 | Geelong Magistrates’ Court, two charges of failing to ensure non-employees were not exposed to risks | A$12,500 fine, no conviction recorded |
| 17 September 2024 | County Court of Victoria, on appeal by the Director of Public Prosecutions | Original sentence set aside; A$40,000 fine plus A$5,557 costs |
| 20 December 2023 | Separate incident at the same centre; a 45-year-old woman sustains a spinal cord injury | Civil claim filed in the Supreme Court of Victoria, damages undisclosed |
| 4 November 2026 | The civil claim is reported publicly | Claim untested; no finding of liability |
The March 2024 penalty was A$12,500. The appeal more than tripled it. That detail matters for anyone who treats a first-instance outcome as the cost of a systems failure: in Victoria the prosecutor can appeal a sentence, and did.
The operator’s position, given to 7NEWS at the time, was that the company had been compliant with all safety standards governing wall climbing features, and that it had added further safety measures afterwards. Both statements can be true at once, which is the uncomfortable part. Product compliance and supervision systems are different questions, and this case was decided entirely on the second one.
2. The six measures, sorted by what they control
Court lists of this kind are usually read as a compliance menu. They are more useful read as a diagnosis, because each item points at a specific failure mode. Three of the six are about who is physically present. Two are about documented instruction. One is about verifying that instruction was understood rather than merely delivered.
| Measure named by the court | Failure mode it controls | What it costs to run |
|---|---|---|
| One employee to fifteen customers in the climbing area | Nobody watching the wall at the moment of clipping | Headcount per session block, not per day |
| Climbing-area staff not also required to fit harnesses | One person doing two incompatible jobs | A second role during peak blocks |
| No entry for unaccompanied children under twelve | No adult present to absorb the child’s attention | Some weekend walk-in demand |
| Documented activity plan setting supervision requirements | Staff improvising, or not knowing they may stop a session | Writing time, then annual revision |
| Safety video on belay use plus a knowledge check by staff | Instruction delivered but not received | A few minutes per group, plus a staff script |
| Parent or guardian present at the briefing for under-twelve guests | Responsibility handed to staff with no handover | Queue time at the desk |
Notice what is absent. There is no hardware item, no signage item and no waiver item. The court did not say the wall needed a different belay, or that the rules board needed bigger type. It said the venue needed people, procedures and verification.
The practical consequence is that none of these six can be bought from an equipment supplier. They can be designed for, though, and that is where most projects lose the argument before they open. If the fitting station sits where the attendant cannot see the wall, then measure two is unachievable no matter how many staff you hire. The geometry of supervision is covered in more detail in our article on trampoline park supervision sightlines, and the cases where layout cannot fix a blind spot are set out in what supervision cannot fix.
The one-line version: the list is not a shopping list for equipment. It is a description of a task, a task owner and a record. Design the building so those three exist, or staff around a building that does not.
3. Why 1:15 is a floor and 32:1 is a ceiling
Two numbers, both real, both frequently quoted, and not comparable. Victoria produced one employee to fifteen customers through a general duty of care provision: section 23 of the Occupational Health and Safety Act 2004, which requires an employer to ensure that persons other than employees are not exposed to risks to their health and safety. The number appeared in sentencing, after harm.
Illinois produced a different number through a different mechanism. Title 56 of the Illinois Administrative Code, section 6000.353, governs trampoline courts and states that at no time shall the ratio of participants to attendants and assistants exceed 32:1. The same section requires an operating manual on site, a court manager aged 21 or over with current first aid and CPR certification present whenever the court operates, and documented job procedures including training. The rule was amended with effect from 25 April 2025.
| Jurisdiction | Instrument | How the number arises | What it binds |
|---|---|---|---|
| Victoria, Australia | OHS Act 2004, general duty; ratio named in a 2024 sentencing | Reasonably practicable measures identified after an injury | The duty holder in that case; persuasive elsewhere |
| Illinois, United States | 56 Ill. Adm. Code 6000.353 | Prescriptive condition of an operating permit | Every regulated trampoline court in the state |
| Most other markets | General safety duties, standards for equipment | No published staffing number | Outcome judged on systems, not on a figure |
The Illinois figure is a ceiling on crowding. The Victorian figure is a floor for attention. Fifteen to one is 2.13 times more staff per customer than thirty-two to one, and the gap exists because the tasks differ: a harnessed wall with self-service clipping is not the same job as patrolling an open trampoline court.
That difference is exactly why neither number should be imported wholesale. If you operate trampoline courts only, the Illinois ratio is a defensible crowding limit and a starting point. If you operate a harnessed climbing element, the Victorian benchmark is closer to your risk profile, because it was set against a self-service attachment step. If you operate both, you need two numbers and a rule about which one applies where, not an average of the two.
One more caution. The Victorian number came out of a sentencing exercise, and sentencing exercises are written about the facts in front of the court. There is no published judgment text in the reporting summarised here, only WorkSafe’s account and the trade press coverage of it. Treat the ratio as evidence of what one court accepted, not as an Australian code, because the figure came from a court and not from a regulator’s table.
4. Task separation is the measure most operators skip
The second measure is the one that gets negotiated away first, because it looks like duplication. One person can hand out harnesses and watch the wall, the reasoning goes, and on a quiet Tuesday that reasoning holds. On a Saturday it collapses, and it collapses in a predictable direction: the fitter looks at the buckle, because the buckle is in their hands, and stops looking at the wall.
The court separated the roles for the same reason airlines separate the person who closes the door from the person who reads the checklist. Fitting is a physical task with a clear completion signal. Supervision is a scanning task with no completion signal at all, which makes it the first thing to disappear under load.
Designing for separation is cheaper than staffing for it. Three details decide whether the split works:
- A fitting point outside the fall zone. If customers are clipped in at the base of the wall, the fitter is standing where a falling climber lands, which means the role cannot be performed continuously.
- A visible handover. The fitter needs a way to tell the attendant that a customer is attached, other than the customer’s own word. A marked staging area does that without hardware.
- A queue that does not cross the wall face. The most common reason attendants leave their scanning position is to manage a queue that has spilled into the climbing area.
None of these is expensive at design stage, and all three are expensive after opening, because retrofitting them means moving walls, moving tills or accepting a permanent staffing penalty. This is the argument for settling supervision before layout freeze, and it is the same argument that appears in our guide to the design-to-delivery process.
5. What the paperwork has to contain to survive an appeal
Two of the six measures are documents, and they are the two that turn a staffing decision into something a regulator can inspect. The first is an activity plan. The wording matters: it must set out the supervision requirements for the task, which means naming who may open the wall, who may close it, and what stops a session.
A plan that says staff must supervise adequately is not a plan. A plan that says one attendant per fifteen climbers, no wall open without a fitter at the station, and any unattached climber at the top triggers an immediate stop, is a plan. The test is whether a new hire on their second shift can act correctly without asking anyone.
The second document is the briefing record. The court’s measure was not a signature on a waiver. It was a video on how to use the belay system, followed by a staff member testing the customer’s knowledge of it. The distinction is the whole point: a signature proves a screen was shown, a question proves the mechanism was understood. For under-twelve guests the court went further and required a parent or guardian to be present for the briefing, which converts a monologue into a handover.
Illinois reaches a similar place by a different route. The state rule requires a staff training plan with documentation of training delivered by a qualified industry training professional, including certificates verifying competency, plus maintenance standards, inspection procedures, incident reporting and logs kept for site, equipment and personnel. Different instrument, same logic: the record is the evidence that the system exists.
If you take one thing from this section, take the sequencing. Video, then question, then record the result. Training, then competency certificate, then keep it retrievable. Most operators do the first step of each and skip the third, which is the only step that helps after an incident.
6. What the ratio costs, in staffed hours
Converting a ratio into money requires three inputs you already own: participants per block, block length, and loaded hourly cost. Nothing below depends on attendance figures, because none have been published for the venue in this case and we are not going to invent them.
attendants_in_block = ceiling(participants / ratio) attendant_hours = attendants_in_block x block_length_hours fitter_hours = blocks_per_week x block_length_hours annual_labour = (attendant_hours + fitter_hours) x weeks_open x loaded_hourly_cost
Table 2 summarises the arithmetic at the two ratios for a single three-hour block.
| Climbers in a three-hour block | Attendants at 1:15 | Attendant-hours (1:15) | Attendants at 32:1 | Attendant-hours (32:1) |
|---|---|---|---|---|
| 30 | 2 | 6 | 1 | 3 |
| 45 | 3 | 9 | 2 | 6 |
| 60 | 4 | 12 | 2 | 6 |
| 90 | 6 | 18 | 3 | 9 |
Add the separate fitter and the 90-climber block moves from six staff to seven. That is the entire cost of measure two: one role, peak hours only. On a 45-climber block it takes the count from three to four. Neither number is frightening next to the alternative.
For scale, the A$40,000 fine plus A$5,557 costs is roughly A$45,557. At an assumed loaded rate of A$28 an hour, the penalty alone equals about 1,600 attendant-hours. Whether that is two seasons of Saturday cover or four depends entirely on your block structure, which is why the calculation belongs in your own spreadsheet rather than in this article.
There is a second, slower cost that rarely makes the model: the same ratio caps how many climbers you can sell into a block. Six attendants at fifteen each means ninety climbers; if you can only staff four, the block sells sixty regardless of demand. On a harnessed element, capacity is a staffing decision before it is a floor-area decision. The labour consequences of that constraint sit alongside the numbers in our piece on staff turnover as an annual line item.
7. What the reporting does not tell us
Three limits are worth stating plainly, because the case is being cited in operator conversations far beyond what the public record supports.
The judgment text is not in the reporting. The six measures are summarised by WorkSafe Victoria and repeated by 7NEWS, Australasian Leisure Management and the Victorian Trades Hall OHS Representatives network. The summaries agree with each other, which is reassuring, but none of them is the sentencing remarks. If you need the exact wording for a legal or insurance purpose, order the judgment.
The civil claim is untested. A 45-year-old woman injured at the same centre in December 2023 is suing in the Supreme Court of Victoria. Damages are undisclosed, the claim has not been heard on the merits, and the operator had not commented when the story was published on 4 November 2026. It would be easy, and wrong, to treat a filed claim as a finding.
The duty is Victorian. Section 23 of the OHS Act 2004 imposes a duty on employers toward non-employees, judged by what is reasonably practicable. That formula does not transplant into United States premises liability, into the product-safety framing used across much of the European Union, or into the Chinese framework for large-scale amusement installations. The tasks are similar everywhere; the legal mechanism is not. Operators in markets with different certification regimes should read the case as an operational lesson, not as a compliance template.
There is also the counter-example, which is the reason this case is interesting rather than merely sad. In 2013 a man fractured his tibial plateau playing trampoline dodgeball at a Bounce venue in Glen Iris. A County Court jury found the risk was inherent in the activity and that he had voluntarily accepted it, and the Court of Appeal dismissed his appeal. The same operator, a different outcome, and the distinguishing feature was not the severity of the injury. It was whether the harm came from a risk the customer could see and accept, or from a control the operator had failed to run.
8. A decision table for your own venue
The useful question is not how many staff a trampoline park needs. It is which task in your building hands a safety-critical step to a customer, and who is watching that step. The table below maps the common formats to the control that actually addresses each one.
| Format | Self-service step | Control that addresses it | Typical failure |
|---|---|---|---|
| Open trampoline courts only | Entering a shared court | Zoned courts plus an attendant per zone at peak | One attendant covering three zones |
| Courts plus auto-belay wall | Attaching the belay to the harness | Dedicated fitter, separate attendant, entry control | Fitter also scanning the wall |
| Courts plus ninja or ropes | Clip-in at height, transitions between elements | Briefed entry, no unaccompanied young children, spot checks | Briefing delivered at the till |
| Courts plus airbag or inflatable | Entry and exit control | Posted rules plus a physically present attendant | Rules on a wall sign only |
Read down the third column and the pattern is consistent: every effective control puts a named person at the point where the customer acts. Read down the fourth and the pattern is equally consistent: failures happen when one person covers two of those points, or when the control exists only on paper.
If your venue has a harnessed element and no dedicated fitter, that is the gap to close first. It is one role, it is peak-hours only, and it is the exact measure a court identified when a child trusted a mat on the floor.
Three things you can do this month
1. Count the self-service steps. Walk your own building and list every point where a customer performs a safety action: clipping, entering, queuing at height, opening a gate. Each one needs a person or a physical control. If a step has neither, you have found the equivalent of the mat on the floor. Our climbing wall range is specified with the fitting and staging sequence in mind, which is the cheapest moment to solve it.
2. Write the stop rule. One page: who may open the element, who may close it, and what a staff member does when they see an unattached climber at height. Test it on someone in their second week. If they hesitate, the plan is not finished.
3. Replace the signature with a question. Keep the waiver for what it is worth, but add a two-question check after the safety video and record who passed it. It takes about a minute per group and it is the difference between instruction delivered and instruction received.
If you are planning a venue with a harnessed element, send us the floor plate and the intended age mix. We will mark where the supervision points fall and which ones the layout makes impossible. That conversation is cheaper before the walls go up: talk to our design team.
FAQ
What staff-to-customer ratio should a trampoline park use?
There is no universal number. The closest published benchmarks are one employee to fifteen customers, named by the County Court of Victoria in 2024 for a harnessed climbing wall with self-service clipping, and a statutory ceiling of 32 participants to one attendant for regulated trampoline courts in Illinois. The first is a remedial standard set after an injury and the second is a permit condition, so neither should be applied to the other activity. Count by zone, not by venue, and set the ratio on the task with the highest consequence.
Does a signed waiver protect a park when supervision fails?
Not for the part that matters. A waiver and the doctrine of voluntary assumption of risk address risks the customer can see and accept, which is why a 2013 dodgeball injury claim against the same operator failed in Victoria. They do not answer a claim that the operator failed to run a supervision system. Treat the waiver as one layer, and the documented supervision plan as the layer that decides cases.
Is an auto-belay wall safe for children without an attendant?
The equipment is not the weak point. The weakness is that the attachment check is performed by the user, and the mat on the floor can read as confirmation that the belay is parked. Where children race each other, that check needs a second party: a fitter at the station, an attendant watching the wall, and a briefing that is verified rather than acknowledged. The fall that produced this case happened on a third climb, after two correct ones.
What has to be in a documented activity plan?
Supervision requirements per task, the named roles, the conditions under which an element may be opened or must be closed, the briefing content, and the records kept. The test is whether a new employee can act correctly without asking. A plan that says staff must supervise adequately does not meet it; a plan that says one attendant per fifteen climbers and no wall open without a fitter does.
Does equipment certification answer a supervision question?
No. Certification and test reports address the equipment and its installation. Supervision is a question about systems of work, which is why the operator in this case could describe itself as compliant with the safety standards governing the climbing feature and still be found to have had no system for supervising customers in that area. Keep the two workstreams separate in your project plan, and do not let a certificate stand in for a staffing model.
Sources
- 7NEWS, “Bounce fined $40,000 after 11-year-old boy falls 4m from climbing wall”, September 2024 (7news.com.au; the article carries the WorkSafe Victoria statement quoted above)
- Australasian Leisure Management, “Indoor play centre fined $40,000 after boy injures back in climbing wall fall”, 1 October 2024 – asianleisure.biz
- Victorian Trades Hall Council OHS Reps, “Fine after child injured at play centre” – ohsrep.org.au
- Daily Mail Australia, “Aussie mum broke her neck at the trampoline park her son loved”, 4 November 2026 – dailymail.com
- Illinois General Assembly, 56 Ill. Adm. Code 6000.353, Trampoline Courts, amended effective 25 April 2025 – ilga.gov
- Occupational Health and Safety Act 2004 (Vic), section 23, duties of employers to other persons – legislation.vic.gov.au
- Illinois Joint Committee on Administrative Rules, Flinn Report, 14 January 2022, summary of trampoline court rulemaking – ilga.gov